New Connection
Procedure |
|
The HESCO has simplified the procedure for
installation of new connections specially for general consumers
of Domestic and Commercial Tariff. Application forms have also
been provided in Urdu.
The following documents are required for general connections
along with application form.
-
Copy of National Identity Card.
-
Copy of Ownership proof. In case the
applicant is not the real Owner, permission from the Owner
on a stamp paper along with Ownership proof.
-
Abridged condition of supply duly signed
by applicant.
|
SCHEDULE FOR PROVIDING DOMESTIC SINGLE PHASE CONNECTIONS |
In order to facilitate domestic consumers,
Authority decided as under:-
-
New domestic connection charges of Rs.
3000/- (Rupees three thousand only) for single phase meter
will be divided into two parts: -
-
Rs. 300/- (Rupees three hundred only) to be
recovered at the time of connection.
-
The remaining amount of Rs. 2700/- (Rupees
two thousand seven hundred only) would be recovered in nine
equal installments of Rs. 300/- (Rupees three hundred only)
each in subsequent bills.
-
The facility will be provided to those
consumers who opt and give written request for the said
facility.
|
|
LUMPSUMP CHARGES OF
CAPITAL COST FOR 3 PHASE GENERAL CONNECTIONS A1 & A-2 |
i |
Length of
service line upto and including 40 meters |
Rs. 8000/- |
|
ii |
Length of
service line above 40 meters and upto and including 100
meters (with one span LT with Ant conductor and one pole
/ structure). |
Rs. 8000/-
Rs. 140/-
|
PLUS
Per meter over and above 40 meters
|
iii |
Length of
service line above 100 meters and upto and including 160
meters (with two span LT with Ant conductor and two
poles / structures). |
Rs. 16400/-
Rs. 220/-
|
PLUS
Per meter over and above 100 meters
|
iv |
Length of service line
above 160 meters and upto and including 280 meters. |
Rs. 29600/-
Rs. 250/- |
PLUS
Per meter over and above 160 meters |
|
RATE OF SECURITY
DEPOSIT |
GM (C.S)/TARIFF/G-226/VOL:III
Dated 11 October 1997 |
1 |
Tariff A-1 (Single-phase
supply). |
Amount of Security
Deposit |
|
- Urban
-
Rural
|
Rs. 400/-
Rs. 200/- |
2 |
Tariff A-1
(Three-phase supply). |
Rs. 1500/-
Plus Rs. 400/- KW for load above 5 KW |
3 |
Tariff A-2 (Single-phase
supply). |
|
|
- Urban
-
Rural
|
Rs. 770/-
Rs. 390/- |
4 |
Tariff A-2 (Three-phase supply) |
Rs.
4600/-Plus
Rs. 800/- KW for load above 5 KW |
5 |
Tariff-B-1 |
320 KW subject to minimum
of Rs. 6400/- |
6 |
Tariff-B-2 |
Rs. 550/- KW |
7 |
Tariff-B-3 |
Rs. 910/- KW |
8 |
Tariff-B-4 |
Rs. 930/- KW |
9 |
Tariff-C-1 |
Rs. 320/- KW
Subject to minimum of Rs. 6400/- |
10 |
Tariff-C-2 |
Rs. 910/- KW |
11 |
Tariff-C-3 |
Rs. 930/- KW |
12 |
Tariff-D |
(49) Rs. 8000/- KW |
13 |
Tariff-D |
(50) Rs. 16000/- KW |
14 |
Tariff-F |
Double the rates of
regular Industrial tariff |
15 |
Tariff-G |
Rs. 970/- KW |
16 |
Tariff-H |
Rs. 920/- KW |
17 |
Tariff-I |
Rs. 330/- KW |
18 |
Tariff-J |
Rs. 910/- KW |
|
|